99久久久久久久,国产精品丝袜久久久久久久不卡,久久精品久久久久久久久久久久久,久久久久久国,久久中文字幕免费,国产精品美女久久久久久网站,国产精品网站在线观看免费传媒

Lu'An Jietonda New Material Co.,Ltd.

Industry news

Information

Lu'an Jietonda Chemical Co., Ltd. Phase II Project Phased Completion Environmental Protection Acceptance Public Notice

Time: 2019-04-01

According to the "Decision of the State Council on Amending the" Regulations on the Environmental Protection Management of the Completion of Construction Projects "" (State Council Order No. 682) and the Announcement of the Ministry of Environmental Protection on the Issuance of the "Interim Measures for the Environmental Protection Acceptance of Construction Projects" 2017] No. 4), the environmental protection acceptance contents (including monitoring reports and acceptance opinions) of the second phase (phased) completion of Lu'an Jietongda Chemical Co., Ltd. are now publicized as follows:

Project name: Lu'an Jietongda Chemical Co., Ltd. Phase II (phased) completion of environmental protection acceptance

Construction site: Lu'an Jietongda Chemical Co., Ltd. Phase II project is located on Anfeng Road, Chengbei Industrial Park, Jin'an District, on the east side of Phase I project.

Construction unit: Lu'an Jietongda New Material Co., Ltd.

Construction content: The scope of this acceptance includes a crushed and mixed packaging workshop with a construction area of ??1800m2, including three sets of crushing production lines and a set of mixed packaging lines; a liquid raw material warehouse, a building area of ??720m2, and a solid raw material warehouse. , A building area of ??720m2; a comprehensive building with a building area of ??3984m2; supporting pollution prevention facilities.

EIA design crushing and mixing packaging workshop is equipped with 5 sets of crushers and 3 sets of mixers. At present, there are actually 3 sets of shredders and 1 set of mixers. The fire storage pool is built at the reserved warehouse location designed by the EIA, and the reserved warehouse will no longer be built. The dormitory building designed and constructed by the EIA is not yet built and is not within the scope of this acceptance. This acceptance is a staged acceptance.

Public announcement time: April 1, 2019 to April 26, 2019 (20 working days)

Contact: Weng Shibing

Contact phone: 18056405879

Email: wsb@jietondachem.com

During the publicity period, if you have any objections to the above publicity content, please provide written feedback. Individuals must sign their real names and the unit must affix their official seals.

Attachment 2 Opinions on Stage Completion and Acceptance of Jietongda Phase II Project.pdf--Click to view

Attachment 1 Lu'an Jietongda Chemical Co., Ltd. Phase II Environmental Protection Acceptance Report.pdf--Click to view

[ BACK ]

CONTACT US

Contact us

Order

HOTLINE:

+86-564-3711165
+86-13966241417
 

Mobile version

Search

Add: 15 Li Dun, North Outskirts of Luan City, Anhui, P, R, China  P.C.:237158
Tel: +86-564-3711165 , +86-564-3711777
Fax: +86-564-3711167 E-mail: jietonda@jietondachem.com

Copyright(C)2019, Lu'An Jietonda New Material Co.,Ltd. All Rights Reserved. Supported by ChinaChemNet ChemNet Toocle Copyright Notice 備案序號:皖I(lǐng)CP備11004581號

洪洞县| 板桥市| 大邑县| 汨罗市| 乡城县| 新龙县| 长葛市| 阳原县| 太白县| 秀山| 荃湾区| 丹江口市| 从化市| 视频| 德清县| 东至县| 荣成市| 万山特区| 巢湖市| 仲巴县| 平塘县| 大连市| 宜兴市| 太仓市| 盱眙县| 黑山县| 龙口市| 工布江达县| 林周县| 宁化县| 黑河市| 洛浦县| 绍兴市| 宣武区| 渑池县| 竹溪县| 织金县| 如东县| 右玉县| 万载县| 望谟县|